Sunday, May 01, 2011

Plastering the Loft

The plastering of the loft has begun. Slav starts with the ceiling. He does the first coat and then the second coat is for perfecting the smoothness. He takes one segment at a time. The ceiling is now completed. From the middle floor it is draped in drop cloths. The walls begin to emerge. The edges are all sharp. I don't know how he managed to get in and out of there AND plaster it. The plaster slowly dries and turns lighter as it does.

No comments: